New Home Construction in North Phoenix | 22 Construction

Serving North Phoenix, North Scottsdale, Carefree, & Cave Creek

New Home Construction in North Phoenix

Quality first, then efficiency, then cost.

Your vision, your lot, our expertise. We build custom homes with a written fixed price, milestone payments, and consistent communication from the first plans to the final walkthrough. Our purpose is to build better homes.

What's included

Build on your lot

Bring your lot or your plans, and we walk the site together.

Clear scope and price

A written scope and fixed price before the work begins.

Your dedicated builder

Same person from the first estimate to the final walk-through.

Permits and inspections

Handled as part of the project, with milestones you can follow.

Our new construction work

New home construction questions, answered

Straight answers from our own projects in North Phoenix, covering lots, cost, permits, and design. Every new home we build is built to high-performance standards. See our high-performance custom homes page for what that includes. Have a question we didn't cover? Ask us directly.

Quick answers

Do you build on lots we already own?
Yes. We walk the site, talk through goals and budget, then price the build in writing.
What does new home construction cost per square foot?
Roughly $250–$400/sq ft for a custom home, $400–$600+ for a higher-end build. Doesn't include the cost of the lot. This $/sq ft includes non-livable spaces such as garages or patios.
How long does it take to build a custom home?
For homes below 4,000 square feet, about 6 to 9 months to build, plus time upfront for design and permitting.
How is a new build paid for?
A deposit starts the project, then payments follow construction milestones written into the contract, all under a written fixed price.
Where do you build new homes?
North Phoenix, North Scottsdale, Carefree, & Cave Creek.

Planning & lot

Do you build on lots we already own?

Yes. We walk the site, talk through goals and budget, then price the build in writing.

What should I look for before purchasing land?

Zoning and what it allows, setbacks, slope and grading, access to the lot, utility availability (water, sewer or septic, power), soil conditions, and any floodplain or easement restrictions. We're happy to walk a property with you before you buy, since catching an issue before closing is far easier than discovering it afterward.

Can you help me find and buy a buildable lot?

Absolutely! We work closely with local real estate agents and can help you navigate the process of finding the right lot for your new home. We also highly recommend having us review a property before you close.

Not every lot is as buildable as it may appear, and a little due diligence upfront can help avoid costly surprises with zoning, setbacks, utilities, grading, and site preparation.

How do I know if my lot is buildable?

We check zoning, setbacks, access, utility availability, and any easements or floodplain issues during the walk-through. Soil conditions also matter for foundation design, so we typically recommend a geotechnical (soils) report before finalizing plans.

Can you build on a hillside or sloped lot?

Yes. Sloped lots need additional engineering for grading, retaining walls, and foundation design, which adds cost but also opens up some of the best views in North Phoenix. We evaluate the slope and soil conditions early so the design and budget reflect what the site actually needs.

Do I need a survey before building?

Yes. A boundary survey confirms your property lines and is required for permitting. If you don't already have a recent one, we can help coordinate getting it done.

What's the difference between custom home building and buying a spec or production home?

A spec or production home is built from a builder's existing plan, often in a planned community, with limited changes. A custom home is designed around your lot and your choices from the ground up, which gives you full control over layout and finishes but takes more time and planning upfront.

How does HOA approval work for new construction?

Many North Phoenix-area communities, especially custom-lot neighborhoods, require architectural review before you break ground, covering things like exterior materials, roof pitch, and setbacks. We help prepare what your HOA needs, but approval timing and requirements are set by your community, so check with them early.

Cost & process

How is a new build paid for?

A deposit starts the project, then payments follow construction milestones written into the contract.

What's a realistic cost per square foot for new home construction in the Valley?

Custom home construction in North Phoenix typically runs $250–$400 per sq. ft. Higher-end homes with premium finishes can range from $400–$600+ per sq. ft. These estimates cover the complete build, from foundation through finishes, but exclude the cost of the lot.

Final pricing depends on finishes, design complexity, engineering, and lot conditions. We'll help you establish a realistic budget based on your property and vision!

How long does it take to build a custom home?

A typical custom home takes about 6 to 9 months to build, plus time upfront for design, permitting, and any lot prep. Larger or more complex homes can run longer. We walk you through the expected schedule before we start.

How often will I receive updates during construction?

We send photo updates as work progresses through each major milestone, so you always know what's happening next. We're also available directly for questions throughout the build, not just at scheduled check-ins.

What causes delays in new home construction?

Permit review time, material lead times, weather, and decisions made mid-project are the most common causes. A detailed written scope and your selections locked in before we break ground is the best way to keep the schedule on track.

Are there financing options for a custom build?

Most custom home builds use a construction loan, which pays out in draws as the work progresses and typically converts to a standard mortgage once the home is complete. We don't offer financing directly, but we work with your lender on the draw schedule and can recommend local lenders experienced with construction loans.

Do I need an architect, or can you design the home?

You don't have to find an architect on your own! We can connect you with a qualified draftsman or architect, depending on your project's needs. We'll work alongside you and the design professional throughout the process to help develop the layout, make sure the design aligns with your vision, and ensure the plans are practical and buildable. We're involved from the initial design all the way through construction!

What is a punch list?

A punch list is a list the homeowner makes near the end of the project that includes fine details before project completion, like paint touch-ups, hardware alignment, and caulking. We walk it with you before calling the job done.

Permits & utilities

How long does it take to get a permit for new construction in Phoenix?

Around 30 calendar days for City of Phoenix lately. The City of Phoenix's published turnaround for a major project (over 2,000 sq ft or more than one level) is a 30-day goal with a 34-day average for the initial plan review, and correction cycles add time on top of that. We build permit timing into your overall schedule from the start.

What utilities need to be run to a new lot?

Water, sewer or septic, electrical, and gas (if used) all need to be run to the home, and the scope of this work depends heavily on how far your lot sits from existing utility lines. We confirm what's needed and what it adds to the budget during the walk-through.

Do I need a well or septic system, or can I connect to city utilities?

It depends on your lot's location. Lots inside city limits with nearby infrastructure typically connect to city water and sewer; more rural North Phoenix-area lots, especially in Cave Creek and Carefree, often need a well and septic system instead. We confirm which applies to your specific lot early on, since it affects both cost and design.

What if the property requires septic or a well?

We coordinate the septic system or well as part of the overall project, including any required permits and inspections. It adds cost and some lead time compared to connecting to city utilities, and we'll walk you through what that looks like for your specific lot early in the process.

What inspections happen during new home construction?

New construction goes through inspections at each major phase: foundation, framing, rough plumbing and electrical, insulation, and a final inspection before you can move in. We schedule these as part of the project and walk you through what each one covers.

Design & building

Can I bring my own house plans, or do you design from scratch?

Either works. If you already have plans, we'll review them for buildability on your specific lot and price the build. If you're starting from scratch, we help you develop a design that fits your lot, budget, and how you actually want to live.

Can you help select materials, finishes, and fixtures?

For a custom home, we highly recommend working with an interior designer to help select materials, finishes, and fixtures, and create a cohesive overall look.

We can refer you to several designers we have established relationships with. We work closely with you and your designer throughout the process, reviewing selections to ensure everything aligns with the design, budget, and construction requirements.

Can you design a home around the views and orientation of my property?

Yes, and for many lots this is one of the biggest value-adds we can offer. Orienting the home and placing windows to capture views while also managing sun exposure and heat gain takes real planning, and we factor it into the design from the start rather than as an afterthought.

Can I make changes once construction starts?

Yes. We understand that ideas can evolve during construction. Any changes will be documented through a written change order outlining additional costs and potential schedule impacts before work proceeds.

We recommend finalizing selections before construction begins whenever possible, since changes made after a phase is completed can be significantly more expensive.

What foundation type is best for Arizona soil?

Most homes in the Valley use a slab-on-grade foundation, which works well with our soil and climate. Lots with expansive clay soil sometimes need additional engineering, like post-tension cables or a deeper footing, which a soils report will flag before we finalize the design.

What should I consider for energy efficiency in a new desert home?

In Arizona's desert climate, energy efficiency starts with a well-designed building envelope. We recommend focusing on:

  • High-quality insulation to keep the heat out and conditioned air inside.
  • Tight building envelope: Systems like ZIP System sheathing help reduce air and moisture infiltration.
  • Energy-efficient windows: Proper placement, orientation, and exterior shading reduce heat gain.
  • High-efficiency HVAC: A properly sized system keeps your home comfortable without wasting energy.

We incorporate high-performance building practices inspired by Passive House principles, focusing on airtight construction, superior insulation, efficient windows, and properly designed HVAC systems. The result is a more comfortable, energy-efficient home with lower long-term operating costs.

Value & decisions

Should I build new or buy an existing home and remodel?

It depends on what you value most. Building new gives you full control over layout, finishes, and energy efficiency, but takes longer and usually costs more per square foot than remodeling. Buying and remodeling can be faster and let you stay in a desirable location, but you're working within an existing structure's limitations. We can help you think through both if you're deciding.

What's the best time of year to start a new home build in the Valley?

We build year-round, so the best time is whenever your financing, lot, and plans are ready. Starting foundation and framing in the cooler months can make the job site more comfortable for the crew, but it doesn't meaningfully change your overall timeline.

How do you handle warranty after the home is complete?

We stand behind our work and offer a 2-year workmanship warranty on your home. Before project completion, we'll walk you through the warranty coverage and answer any questions.

Manufacturer warranties on appliances, equipment, and major systems are separate, and we'll provide all applicable documentation so you know exactly what's covered. Our relationship doesn't end when construction is complete. We're here if you need us!

Tell us about your project

We reply within one business day. Prefer to talk? Call or text 602-573-6060.

Email: zak@22construction.com